I did a 48 hr moisture test and the concrete is dry (40 years old, but partly below ground level.)
I have 5.5 mm engineered vinyl planks.
I also have some leftover 3 mm and 4 mm felt underlayment with a vapor barrier attached.
I read I should use a vapor barrier over concrete, but the...