Hello,
I will soon be installing 1-1/2" wide 3/4" thick solid oak strip flooring in my kitchen to match the rest of the main floor of my 1963 rambler here in Minnesota. Previously, the kitchen flooring was thin carpet over 3/4" plywood.
Like the rest of the flooring, these boards will be laid perpendicular to the solid wood joists. Another key detail is that the subfloor is 1/2" plywood (and not tongue-and-groove).
The original oak flooring elsewhere in the house was nailed primarily to the joists, so only about every 16". I will be using cleats (much flimsier than the current nails, but maybe with some additional holding power due to the 'ribbing') and could certainly do the same, but I've heard that people nowadays prefer to nail every 6-8" or so. The existing flooring is in real good shape, just some minor gaps here and there in the winter.
The subfloor has some deflection at seams between the joists, so I plan to at least install solid blocking between the joists to address this. I will also take the common measure of screwing down the subfloor to reduce squeaking.
However, what I'm wondering about is whether nailing between joists into 1/2" plywood, that being so thin, will help much, or if I should beef up the subfloor from below (between the joists, glued to the underside of the subfloor) with some additional plywood where I can. What do ya'll recommend here?
I will soon be installing 1-1/2" wide 3/4" thick solid oak strip flooring in my kitchen to match the rest of the main floor of my 1963 rambler here in Minnesota. Previously, the kitchen flooring was thin carpet over 3/4" plywood.
Like the rest of the flooring, these boards will be laid perpendicular to the solid wood joists. Another key detail is that the subfloor is 1/2" plywood (and not tongue-and-groove).
The original oak flooring elsewhere in the house was nailed primarily to the joists, so only about every 16". I will be using cleats (much flimsier than the current nails, but maybe with some additional holding power due to the 'ribbing') and could certainly do the same, but I've heard that people nowadays prefer to nail every 6-8" or so. The existing flooring is in real good shape, just some minor gaps here and there in the winter.
The subfloor has some deflection at seams between the joists, so I plan to at least install solid blocking between the joists to address this. I will also take the common measure of screwing down the subfloor to reduce squeaking.
However, what I'm wondering about is whether nailing between joists into 1/2" plywood, that being so thin, will help much, or if I should beef up the subfloor from below (between the joists, glued to the underside of the subfloor) with some additional plywood where I can. What do ya'll recommend here?
- Should I thicken my subfloor by adding plywood from below?
- If so, what thickness would be good without getting excessive?
- Should I still nail every 6-8"?
Last edited: