hello,
I have a 5x5 ft bathroom covered in sheet linoleum and i am trying to lay floating rigid core vinyl plank over it.
I have a 2 foot wide by 3 foot long dip in the floor that tapers down to 1/4 inch deep in the center and the sub floor is like particle board material.
it starts at the toilet flange and extends 8 inches to to the edge of the wall and 2 ft from the flange in the opposite direction.
any ideas on how to level this before laying the plank flooring down?
thanks for any help with this!
I have a 5x5 ft bathroom covered in sheet linoleum and i am trying to lay floating rigid core vinyl plank over it.
I have a 2 foot wide by 3 foot long dip in the floor that tapers down to 1/4 inch deep in the center and the sub floor is like particle board material.
it starts at the toilet flange and extends 8 inches to to the edge of the wall and 2 ft from the flange in the opposite direction.
any ideas on how to level this before laying the plank flooring down?
thanks for any help with this!
Last edited: