Been fairly busy. Shop called me late yesterday, begging me to do a job, but I didn't think it would fit into my timeline. I have jobs scheduled tomorrow (Saturday) and another on Monday. Next week is full. That gave me today, and Sunday to do this job........... sight unseen.
..........a little more begging from the store owner made me give it some thought. The job is 50 minutes away, and so at 6:30pm yesterday, I drove down to look at it to see if I could do it in two days. If not, I was going to say no. Without actually seeing the jobsite and conditions, I just couldn't take a chance on agreeing to do it. I hate surprises, especially when out of town.
I was
initially told it was just a living room with one seam. Furniture would be moved and there was tear out to do. It's a softback carpet with a very soft 5/8" nap. (heavy)
Well, I got down there last night to find out that it
was a living room with a seam ...........
plus a hallway. (the plot thickens)
The hallway and the living room have a total of 30 feet of transition areas. 5 doorways with tap down metal, plus three doorways that would need to be turned and tacked or Z-bar..............
plus an entry that had laminate with 3 angled faces to turn and tack, or use Z-bar.
The old carpet had tap down metal plus tackstrip in all of the doorways.
I bit the bullet and said yes to the customer. Furniture was already moved out, and the carpet needed to be installed because there are a lot of friends and family coming next weekend to celebrate this lady's, husband's, big '60' It's partly a surprise party.
Long story short. (I do this a lot, don't I?)
I drove down to the job last night to look at it. ............then out of guilt, agreed to do it, then drove back to town to pre-cut the carpet to shape, and also pre-cut the pad to lengths so it would be ready to go in the morning, and loaded the materials into the van.
I took a lot of time ripping out all those doorway metals and the accompanying tackstrip............ I can't believe the size and number of nails some installers use for metal and backup.
Got the metal removal and new replacements done, the main run and hallway in place and then the hallway completed. I doubled up al the strip because of the softback. I also had to straighten 60 inches of the entryway's laminate floor with my Fein Multimaster. The boards were installed way to random for a finished edge.
I vacuumed it all up, loaded up all of my tools and the old carpet, and got back to town at 8pm. Then I went to the warehouse to re-roll
tomorrow's carpet without it's tube, so it will bend as I carry it in. (This is my Saturday job...... just a one piece bedroom)
In the afternoon, I need to make a router guide for Monday's job.
Sunday I'll drive back down and complete
today's job, then Monday is most of a day doing a repair/for the store. The installer did a lousy job fitting carpet to a prefininshed wood floor. I think that I'll use my router to make a groove into the underlayment to make a shallow gully so that the carpet will tuck deeper below the wood floor. The carpet is thick, the flooring ain't.
Tuesday and the rest of the week will be playing second fiddle to an out of town slum lord who needs to resurface his rental's roof and prep and paint the outside of it. There's also 3 to 5 courses of water damaged siding to replace, and maybe new downspouts too.
I got home a almost midnight last night, and after 8 tonight. I'm hurting. (shameless plea for sympathy and support)
I don't do well with long days, but need the $$$. I'm taking it while the work is till flowing.
(oh, and that hall I got done today with all those doorways? ............it's 5'5 by 13'. I made $30 for a 7 hour day. (NOT)