That's funny. I'll never try and snatch
your purse Daris.
I find myself not working 8 or 10 times more than working, so I know it doesn't take long to get out of shape.
I've installed 400' of VCT, 200 yds of carpet and done two carpet repairs since the end of October.
.....and those 200 yds of carpet were on the same job. That's how slow I've been.
In the mean time, I have been tinkering on a job for a very good friend, converting an old tool shed into a sewing room....... pay isn't very good. I offered it to her priced out as a 'will work for food' job to fill in when I'm not doing anything else. Lot larger job than I thought it was going to be, but a lot of fun. It's just a 12 by 12 building between their house and shop.
It's involved everything from realigning the studs to make the walls and ceiling flat enough for sheet rock, framing in and installing a new outside door, mudding and texturing the walls and semi-vaulted ceiling, leveling the floor and installing vinyl, installing and painting the trim, and I'm just now finishing up the 6 by 12 front porch/deck. It is complete with steps and a railing. It's been a fun project, but it's coming to completion. Darn.......... her husband is a fantastic cook.
The agreement on my end was pay for my gas and feed me, and I'll come down and work on it when I have time. Since August, she's probably tossed me around $1500...... a little here, a little there. The project was way to big to make it a "real" payin job. I'd be surprised if makin 1/2 minimum wage. Keeps me in some sort of shape tho, for when
real work does appear. I actually like this work a lot more than flooring.
Am I off topic, or just Off My Rocker?