Hey experts:
I am in the process of stapling down engineered flooring. Everything is going smoothly, but I've come to a crossroad or sorts. I am at the opposite side of the hallway from where I began and I find that my stapler does not allow me to staple at an angle due to the close proximity of the opposite wall. I have approx. 2 and 1/4 rows to go. How should I secure these rows? Should I face nail the 2 1/4 rows? Should I lay the 2 rows loose and face nail the last 1/4 row?
Any help would be greatly appreciated!
Thanks
I am in the process of stapling down engineered flooring. Everything is going smoothly, but I've come to a crossroad or sorts. I am at the opposite side of the hallway from where I began and I find that my stapler does not allow me to staple at an angle due to the close proximity of the opposite wall. I have approx. 2 and 1/4 rows to go. How should I secure these rows? Should I face nail the 2 1/4 rows? Should I lay the 2 rows loose and face nail the last 1/4 row?