Went to this job to prep the floor then go back later to lay vinyl planks in two bathrooms and found this in one bathroom
Plumber said just wrap the planks over the edge
Plumber told what to do along with a photo of the correct floor waste
Builder went and checked and found it was still wrong so plumber tried to fix again so I went back to find this
So I laid the other bathroom and left
Went back a week later after plumber was told to make sure the grate was straight to the walls with me being told just lay the planks
This is what I got which was kinda correct
Only trouble was when I put the grate in this happened which looks stupid especially after we went to all the trouble of telling the plumber what to do
Would you be happy with this in your house?
Any problems plumber will be paying for the replacement as I cant see lifting the planks even with heat as it will pull up the smoothing compound
Plumber said just wrap the planks over the edge
Plumber told what to do along with a photo of the correct floor waste
Builder went and checked and found it was still wrong so plumber tried to fix again so I went back to find this
So I laid the other bathroom and left
Went back a week later after plumber was told to make sure the grate was straight to the walls with me being told just lay the planks
This is what I got which was kinda correct
Only trouble was when I put the grate in this happened which looks stupid especially after we went to all the trouble of telling the plumber what to do
Would you be happy with this in your house?
Any problems plumber will be paying for the replacement as I cant see lifting the planks even with heat as it will pull up the smoothing compound