Did a job last week. Every seam in the house was done with sticky tape and the pad was all upside down. Upstairs it was stapled every inch around the perimeter( and taped) about every 6" out in the field. Downstairs it was glued to the concrete with latex. Not just latex but damn good latex.
I scraped with a 6" for a good 20 min before I gave up and borrowed a self propelled scraping machine. All told it took about 4 hours to get the machine and the pad up in a 20 x 12 room. Then I had to re-nail all the strip. Scratch that, NAIL all the strip as it was put down with construction adhesive and none of it stuck. All the nails were laid over. The concrete was butter by the way. I guess if you aren't so much as kicking the carpet in and you can't when you are using sticky tape, it doesn't matter what you glue it down with.
I was hoping to be out of there by 1 friday, as I only had the 1 room downstairs to do, I walked out the door at 6:30.



I scraped with a 6" for a good 20 min before I gave up and borrowed a self propelled scraping machine. All told it took about 4 hours to get the machine and the pad up in a 20 x 12 room. Then I had to re-nail all the strip. Scratch that, NAIL all the strip as it was put down with construction adhesive and none of it stuck. All the nails were laid over. The concrete was butter by the way. I guess if you aren't so much as kicking the carpet in and you can't when you are using sticky tape, it doesn't matter what you glue it down with.
I was hoping to be out of there by 1 friday, as I only had the 1 room downstairs to do, I walked out the door at 6:30.