Nick
In Remembrance
..................and I live on the coast.
Not sure I'm understanding this. Plywood? The risers will be the only plywood on the stringers, the treads are 1 inch unfinished oak. The floor inside the stair enclosure pins out at 12% 14% and 16%, the treads are stored elsewhere and pin out at 6% or less.
Plan is to acclimate the treads in the house bu leaning them against the walls for good air circulation. I was told a week or possibly two to acclimate.
I figure sealing the floor inside the stairwell with something.......... Bosticks, or Aquabar and plywood, to stop air from coming in from under the house.
Once the stairwell is sealed off by installing treads and risers, there will be no air movement inside the cavity.
If the floor under the stairs is not sealed off, the moisture will in my opinion, build up under the stairs once they are finished.
I'm gonna seal the underside of all the treads after it's acclimated.
You won't know till you pin it .