Our concrete slab was poured in December as our house is completely new. We are now getting engineered wood floors installed. The carpet and vinyl has been removed. I am concerned that there may be a moisture problem, but the guys who will be installing the floors told us we do not need to check the moisture content of the concrete slab. Especially since we will be using a glue with a moisture barrier incorporated into it. Do we need to push to get the moisture content checked out before we proceed?