madmax64
Active Member
Highup, I am following your post #5. I just finished sanding plywood seams. I am going to use a cement-based floor patch to fill in "holes" (gaps, etc) and use cement-based self-level underlayment (Henry 555). Then cover the entire subfloor with 1/2" plywood, correct? How do I fasten 1/2" plywood to the subfloor? (how far between two nails or screws)? The existing wooden subfloor is 3/4" thick. Should I use 1 1/4" nails or 1 1/4" screws?
let me know and thanks!
let me know and thanks!