Nick
In Remembrance
Hope it gets you home on January 7th.
You know something i don't about 1/7 ?
Hope it gets you home on January 7th.
You know something i don't about 1/7 ?
I have a PITA job Monday. When you do something for a friend, the jobs are always a PITA.
I just finished a PITA job this afternoon. 3 days for 51 yards with one 10ft one piece seam. Cheap cheap ass berber 2 colors white and brown pattern. Stuff was so cheap when you cut the yarn it blossomed out like the seed ball on a dandelion, Then to top it off when you tried to tuck it in under raised baseboard the yarns would fall off the side back 2-3 rows. I ended up restretching the cheap **** 3 times and try to keep the pattern straight. I had cut down one corner on the cheap **** and ended up having to put in a dutchman to cover the corner. Then had to put that cheap **** on a stairway that wasn't straight so where it curves in and out the lines come and go. Cheap ****!! Did I say that **** was cheap. Pure cheap **** I tell ya! Well it pretty much made up my mind to get rid of my tools.
Daris :machine gun:
How do you really feel about it Daris ?
You're better off doing your trow rugs .
You work too hard.
You get the good jobs
Were there staff from the building working there as well or do you do it outside normal work hours?
Suppose you were told the place was empty
Ouch! I hope you recover quickly. I'm still being a wuss about my ankle that I twisted. It's mostly recovered but gets a little sore if I step certain ways or if the dogs ram my foot.Stepped wrong last night. Back to cane. Had to back out on the job today. Wonder if my body is telling me a too old to install? AT this point, I am ready to put the tools away and restore my van.
Nice!Did a church school, several classrooms and a couple of large halls.
One was three fifty two foot shots..room was 22 by 52. It was all shaw 26 oz
unitary. The two big rooms had to have glue removed for two days. Finished 3 am Sunday !
http://www.flooringforum.com/photo/albums/flooring-gigs-19.html
Wow! that is a lot of stuff! Makes me glad that our stuff hadn't arrived yet when we had our flooring done. Our flooring guy only had to move a few things-- although one of the things was a very heavy solid wood desk that once belonged to the Smithsonian Institute (they auctioned it off to get some $).furniture
all day
not done
Nicely done!!This is what I did today
Pulled up about 5 lin m 2 m wide cause another layer made one hell of a job with the floor prep. Looks like he used a shovel instead of a trowel
That is Feather Finish
Should have taken a before photo